Bitte benutzen Sie diese Referenz, um auf diese Ressource zu verweisen: doi:10.22028/D291-25070
Titel: Fast loading and unloading devices : planning and scheduling requirements
VerfasserIn: Funk, Petra
Sprache: Englisch
Erscheinungsjahr: 1998
Quelle: Kaiserslautern ; Saarbrücken : DFKI, 1998
Kontrollierte Schlagwörter: Künstliche Intelligenz
DDC-Sachgruppe: 004 Informatik
Dokumenttyp: Forschungsbericht (Report zu Forschungsprojekten)
Abstract: This report has been compiled within the Platform project. The project itself aims at the enhancement of transhipment processes in an intermodal terminal. A crucial process within a terminal is loading and unloading of Intermodal Transport Units from trucks onto trains and vice-versa. Traditional terminal technology, such a gantry cranes, reach stackers, straddle carriers or mobile cranes are usually applied without precomputed schedules. Whereas one of the goals of the project is to show possible enhancements through scheduling and planning the use of these devices, this report describes and compares new terminal equipment. The new equipment allows for parallel or quasi parallel access to the ITUs on trains and thus provides fast transhipment processes. The comparison in the report focuses on the planning and scheduling requirements of these new fast handling devices.
Link zu diesem Datensatz: urn:nbn:de:bsz:291-scidok-39157
hdl:20.500.11880/25126
http://dx.doi.org/10.22028/D291-25070
Schriftenreihe: Technical memo / Deutsches Forschungszentrum für Künstliche Intelligenz [ISSN 0946-0071]
Band: 98-03
Datum des Eintrags: 8-Jul-2011
Fakultät: SE - Sonstige Einrichtungen
Fachrichtung: SE - DFKI Deutsches Forschungszentrum für Künstliche Intelligenz
Sammlung:SciDok - Der Wissenschaftsserver der Universität des Saarlandes

Dateien zu diesem Datensatz:
Datei Beschreibung GrößeFormat 
TM_98_03.pdf104,25 kBAdobe PDFÖffnen/Anzeigen


Alle Ressourcen in diesem Repository sind urheberrechtlich geschützt.